Before your installation

Usually a week or two before your install date, one of our team will pop around to assess your property externally and help ensure the installation goes smoothly. We call this ‘pre-enablement.’

During this visit, we’ll make sure that nothing (like an overhanging tree or a blocked underground duct) will hamper your installation. And we’ll choose the route with the least disruption for your new line to take, either under or over ground.

If any external works are required these will be done there and then if possible, ahead of the installation and with the utmost care. And we will leave a coil of fibre ready for the installation, at the entry point. All of this applies to the outside of your property, so you don’t even need to be at home for this visit.

Once confirmed we’ll send you reminder text messages the day before, on the morning of the appointment, and when the team are on their way to your home.